In the prior post, phases 1 and 2 were outlined for a successful, internally driven ER / Inpatient Flow and Error Reduction project.
Here is Phase 3 (and Phase 4)
Phase 3: Culture & Capacity (9–18 months)
Build long-term resilience and error-proofing.
Non-punitive error reporting system with monthly feedback loops.
Metric: Increase near-miss reporting by 50% (proxy for safety engagement).
2. Cross-Training & Flexible Staffing
Cross-train RNs and techs to flex between triage, fast track, and resus.
Metric: Staff utilization efficiency improves (measured by staffing-to-volume alignment).
Daily “bed huddles” with inpatient units to free up admissions.
Create discharge lounge to offload admitted patients.
Metric: Boarding time reduced by ≥20%.
Phase 4: Technology & Advanced Analytics (18+ months)
Leverage predictive tools for proactive management.
1. Predictive Analytics for Volume
AI forecasts of surges → adjust staffing and beds proactively.
Metric: Staffing alignment accuracy >80%.
2. AI Clinical Decision Support
Alerts for sepsis risk, abnormal labs, high-risk medications.
Metric: Sepsis bundle compliance >90%.
Virtual psych, dermatology, or low-acuity consults to reduce ED burden.
Metric: Time-to-consult reduced by ≥30%.
📊 Summary of Key Metrics
Door-to-disposition decision ↓
Communication-related errors ↓
Sepsis and stroke bundle compliance ↑
Boarding times ↓
✅ Takeaway: Start small (provider-in-triage, fast track), then scale into system redesign (dashboards, lean workflow), and finally embed a culture of safety and predictive management.
#HospitalSafety #HospitalExecutive #CareManagement #EmergencyNursing #EmergencyProviders #EmergencyMedicine #NursingLeader
No comments:
Post a Comment